Anson Engine Museum
Anson Engine Museum Gallery
Home
Login
Anson Engine Museum
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favorites
Search
Home
>
Archive photos of engines and museum views
>
Construction Work up to 2007
Most viewed - Construction Work up to 2007
getting to grips with the Campbell
2067 views
the engine had to be dismantled in the car park prior to its move to a new location
prior to the move
1987 views
the engine had to be dismantled in the car park prior to its move to a new location
Trees being removed to widen the driveway
1983 views
Trees down the drive need to be taken down to widen the area
1978 views
More stone ready for flattening
1866 views
One of the "Friends" of the museum, Jimmy Jackson donated money to allow us buy more stone for the car park.
Preparing the foundations
1853 views
Work on widening the drive and entrance area before new surface laid
1679 views
crank case being lifted off
1619 views
the engine had to be dismantled in the car park prior to its move to a new location
Another delivery of concrete for the floors arrives
1618 views
Campbell Engine being reassembled outside museum entrance
1617 views
The flywheel being lowered into place.
More stone waiting to be laid
1616 views
One of the "Friends" of the museum, Jimmy Jackson donated money to allow us buy more stone for the car park.
The concrete for the floor had to be laid in sections
1600 views
105 files on 9 page(s)
1
2
3
4
5
6
7
8
9