Anson Engine Museum

Anson Engine Museum Gallery


DSCF0032.jpg
Campbell Engine now in position outside museum entrance1485 viewsThe 40 ton Campbell has now been put back together as a gate guardian
DSCF0035_renamed_1372.jpg
Another delivery of concrete for the floors arrives1613 views
DSCF0041_renamed_23776.jpg
Trees down the drive need to be taken down to widen the area1973 views
DSCF0045_renamed_27381.jpg
Work on widening the drive and entrance area before new surface laid1674 views
DSCF0046_renamed_3875.jpg
Work on laying new surface on drive area1380 views
DSCF0047.jpg
Outside shell goes up1493 views
DSCF0047_renamed_13100.jpg
New surface for drive entrance1493 views
DSCF0053.jpg
Most of the buildings metal supports in place1398 views
DSCF0053_renamed_1941.jpg
Front wall brickwork going up1346 views
DSCF0055_renamed_1758.jpg
Blocks ready to be go in place1370 views
DSCF0056_renamed_30496.jpg
Work on bringing the steam engine building up to scratch1331 views
DSCF0058_renamed_22534.jpg
Front of steam engine building given a new look to match the new building1364 views
105 files on 9 page(s) 3