Construction Work up to 2007
|
|
|

Campbell Engine now in position outside museum entrance1517 viewsThe 40 ton Campbell has now been put back together as a gate guardian
|
|

Another delivery of concrete for the floors arrives1646 views
|
|

Trees down the drive need to be taken down to widen the area2006 views
|
|

Work on widening the drive and entrance area before new surface laid1703 views
|
|

Work on laying new surface on drive area1407 views
|
|

Outside shell goes up1527 views
|
|

New surface for drive entrance1533 views
|
|

Most of the buildings metal supports in place1423 views
|
|

Front wall brickwork going up1365 views
|
|

Blocks ready to be go in place1394 views
|
|

Work on bringing the steam engine building up to scratch1355 views
|
|

Front of steam engine building given a new look to match the new building1388 views
|
|
|